Industrial Projects
Bakery Chef

In this project we provided the electrical installation for a new shipping conveyor system and pancake batter mixer. All materials had to be preassembled away from the food manufacturing areas.

Reservoir

This facility provides water for the Cedar River which in turn provides drinking water for most of King County. These pumping barges located in the reservoir are used to pump water over the dam when the water level gets too low. We test and install wire as needed in order to keep pumping barges operational.

Water Lift

This underground sewage lift station consisted of 3 200HP pumps. We provided all of the electrical for the building, the pumps, the controls, wet well and dry well telemetry systems. Most of the work was below the year round water table which required extra measures to keep water out of conduits and equipment.

Taxiway

We provided and installed new conduit, wire, taxiway lights, runway lights and signage for the Renton Airport. We rewired and relocated the VASI and PAPI for the airport. This project required the installation of over 26,000' of conduit, and 50,000' of wire at a working airport where new Boeing 737s were delivered from.