This underground sewage lift station consisted of 3 200HP pumps. We provided all of the electrical for the building, the pumps, the controls, wet well and dry well telemetry systems. Most of the work was below the year round water table which required extra measures to keep water out of conduits and equipment.
|

Excavation for pump station
|

Conduits located between roof of pumping station and floor of access building
|
|
|

Lower level control room
|

Completed building with electrical service, blowers, and generator
|