Equipment Inspection Inspected By:*Project:*Select a ProjectAmazon BFI1-MISCAmazon BFI1-Power Monitoring 10/2019Amazon BFI4- LIDAR 10/2019Amazon BFI4-Clean Electrical Panels 10/2019BFI1-iMap project 8/2019NWHS-Col Dist-Data reroute 10/2019NWHS-Col Dist-Yakima Chargers 10/2019NWHS-Col Distribution Driver Jack Chargers 9/2019OfficePace Matr-Boeing Everett Bldg 40-37 VRCPacific Const-Col Distributing-Offices 9/2019PESCO-Baker Texaco-Snohomish, WA 8/2019PESCO-Paine Field 8/2019PESCO-Pt Orchard Shell 8/2019Pick Up MaterialRainier Commons MiscRamToray AGVToray-Rewinder 7/8 10/2019TravelTSI-Novelty Hill BFV Replacement 10/2019TSI/Redmond LS-1TSI/Redmond LS-4TSI/Redmond LS-5TSI/Redmond LS-6TSI/Redmond LS-7TSI/Redmond LS-8TSI/Redmond Project ManagerOtherSite:Date of Inspection:* Date Format: MM slash DD slash YYYY Equipment ID:*Equipment Type:*SELECTScissor LiftBoom LiftForkliftForklift Inspection ChecklistVisual Checks Parking Brake Set*SatisfactoryNon-satisfactoryN/AGear Level in Neutral*SatisfactoryNon-satisfactoryN/AForks - Locking Pin*SatisfactoryNon-satisfactoryN/ABackrest*SatisfactoryNon-satisfactoryN/ACarriage*SatisfactoryNon-satisfactoryN/AMast*SatisfactoryNon-satisfactoryN/ATires and Pin*SatisfactoryNon-satisfactoryN/AOverhead Guard / Covers*SatisfactoryNon-satisfactoryN/AFluid LevelsFuel*SatisfactoryNon-satisfactoryN/AHydraulic Oil*SatisfactoryNon-satisfactoryN/AEngine Oil*SatisfactoryNon-satisfactoryN/AWater Level*SatisfactoryNon-satisfactoryN/ABrake Fluid*SatisfactoryNon-satisfactoryN/ABattery (Electric Lift)*SatisfactoryNon-satisfactoryN/AOperational CheckInstrument Readings*SatisfactoryNon-satisfactoryN/ALights*SatisfactoryNon-satisfactoryN/AHorn*SatisfactoryNon-satisfactoryN/ALift/Lower/Tilt*SatisfactoryNon-satisfactoryN/ASteering*SatisfactoryNon-satisfactoryN/ABrakes - Parking - F / R*SatisfactoryNon-satisfactoryN/ABrakes - Moving - F / R*SatisfactoryNon-satisfactoryN/ACommentsScissor Lift Inspection ChecklistFluid LevelsFuel Level*SatisfactoryNon-satisfactoryN/AEngine Oil Level*SatisfactoryNon-satisfactoryN/AHydraulic System Level, Visible Leaks*SatisfactoryNon-satisfactoryN/ABattery Water Level, Condition, and State of Charge*SatisfactoryNon-satisfactoryN/AVisual ChecksPlatform Structure, Cleanliness, Physical Condition*SatisfactoryNon-satisfactoryN/AInstruction Placards, in place and legible*SatisfactoryNon-satisfactoryN/AEye Wash Bottle, Fire Extinguisher (if applicable)*SatisfactoryNon-satisfactoryN/ATires*SatisfactoryNon-satisfactoryN/ATest the Tilt Alarm (if applicable)*SatisfactoryNon-satisfactoryN/AOperational Checks: From the Ground Control StationRaise/Lower Platform*SatisfactoryNon-satisfactoryN/ARaise Platform and Lower with Auxiliary Power*SatisfactoryNon-satisfactoryN/ARaise Platform and Lower with Manual Bleed Valve(s)*SatisfactoryNon-satisfactoryN/ATelescope Out and In*SatisfactoryNon-satisfactoryN/ASwing Platform Right/Left*SatisfactoryNon-satisfactoryN/AOperational Checks: From the Platform Control StationFasten Safety Harness*SatisfactoryNon-satisfactoryN/ATelescope Out and In*SatisfactoryNon-satisfactoryN/ARaise and Lower Platform*SatisfactoryNon-satisfactoryN/ASwing Right and Left*SatisfactoryNon-satisfactoryN/AExtend and Level Outriggers (if applicable)*SatisfactoryNon-satisfactoryN/ADrive Forward/Reverse, Right/Left*SatisfactoryNon-satisfactoryN/ARaise Platform and Descend with Auxiliary Power*SatisfactoryNon-satisfactoryN/ACommentsBoom Lift Inspection ChecklistFluid LevelsFuel Level*SatisfactoryNon-satisfactoryN/AEngine Oil Level*SatisfactoryNon-satisfactoryN/AHydraulic System Level, Visible Leaks*SatisfactoryNon-satisfactoryN/ABattery Water Level, Condition, and State of Charge*SatisfactoryNon-satisfactoryN/AVisual ChecksPlatform Structure, Cleanliness, Physical Condition*SatisfactoryNon-satisfactoryN/AInstruction Placards, in place and legible*SatisfactoryNon-satisfactoryN/AEye Wash Bottle, Fire Extinguisher (if applicable)*SatisfactoryNon-satisfactoryN/ATires*SatisfactoryNon-satisfactoryN/ATest the Tilt Alarm (if applicable)*SatisfactoryNon-satisfactoryN/AOperational Checks: From the Ground Control StationRaise/Lower Boom*SatisfactoryNon-satisfactoryN/ARaise Boom and Lower with Auxiliary Power*SatisfactoryNon-satisfactoryN/ARaise Boom and Lower with Manual Bleed Valve(s)*SatisfactoryNon-satisfactoryN/ATelescope out and in*SatisfactoryNon-satisfactoryN/ASwing Platform Right/Left*SatisfactoryNon-satisfactoryN/AOperational Checks: From the Platform Control StationFasten Safety Harness*SatisfactoryNon-satisfactoryN/ATelescope Out and In*SatisfactoryNon-satisfactoryN/ARaise and Lower Boom*SatisfactoryNon-satisfactoryN/ASwing Right and Left*SatisfactoryNon-satisfactoryN/AExtend and Level Outriggers (if applicable)*SatisfactoryNon-satisfactoryN/ADrive Forward/Reverse, Left/Right*SatisfactoryNon-satisfactoryN/ARaise Boom and Descend with Auxiliary Power*SatisfactoryNon-satisfactoryN/AComments Δ